Building or renovating in Toronto? Whether you’re planning a home addition, basement conversion, laneway suite, or a brand-new custom home, understanding how to obtain a Toronto building permit is crucial.
This guide breaks down the entire process step-by-step, with official City of Toronto links and professional tips from our construction experience.
You can either file it yourself or you can reach out to any licensed contractors to do it for you.
A building permit is an official approval from the City of Toronto that allows you to proceed with construction, renovation, demolition, or change of use on your property. It ensures that the work complies with:
The Ontario Building Code
The City of Toronto Zoning By-laws
Local planning regulations and safety standards
Failing to get a permit can lead to fines, stop-work orders, and costly delays.
Official Toronto Building Permit Page
You need a permit if your project includes:
Building a new home, addition, or laneway/garden suite
Finishing a basement (creating a secondary suite)
Removing or altering load-bearing walls
Installing new plumbing, HVAC, or electrical systems
Changing window or door openings
Demolishing a structure
You do not usually need a permit for:
Painting, flooring, or cosmetic finishes
Replacing existing windows (same size)
Re-roofing (no structural change)
Kitchen or bathroom replacements without structural/plumbing changes
When in doubt, contact Toronto Building for clarification.
Check if You Need a Building Permit
Before you start designing, confirm what’s allowed on your property.
Review zoning restrictions such as height, lot coverage, and setbacks.
If your project doesn’t comply, you may need to apply for a minor variance from the Committee of Adjustment.
Go to Toronto Zoning By-law Maps
Step 2: Prepare Your Drawings and Documents
Your application must include detailed drawings and reports such as:
Site plan and lot grading plan
Architectural, structural, mechanical, and electrical drawings
Building permit application forms
Energy efficiency design summary
Tree declaration and zoning certificate (if applicable)
All drawings must comply with the Ontario Building Code and City’s electronic submission standards.
See the Electronic Submission Guidelines (PDF Requirements)
| Permit Type | Description | Typical Use |
| Full Building Permit | Required for new homes, additions, or major structural work | Custom homes, additions |
| Partial Permit | Allows starting foundation or framing while full plans are under review | Large projects |
| Demolition Permit | Needed before removing any existing structure | Tear-downs |
| Plumbing / HVAC Permit | For plumbing, drainage, and mechanical work | Reno projects |
| Express Permit | Fast-track for small projects | Decks, porches, interior non-structural work |
Express Building Permits – City of Toronto
Once your documents are ready, submit them electronically to Toronto Building.
You can email the application or use the City’s secure file transfer system (SFTP) for large files.
Your application must include:
Completed application form
All drawings (PDF, to scale)
Schedule 1: Designer information form
Applicable fees (based on project area)
After submission, your plans will go through several reviews:
Zoning review
Structural review
Mechanical/plumbing review
Fire and safety review
If deficiencies are found, you’ll receive a revision notice.
Your designer or contractor must address all items before approval.
Once the plans are approved, you’ll receive a Building Permit — this is your official green light to start construction.
Keep the permit posted on site and follow all conditions listed.
During construction, you must schedule inspections at key milestones:
Foundation / footing
Framing
Insulation & vapour barrier
Plumbing, HVAC, electrical
Final inspection before occupancy
You can book inspections online or by contacting Toronto Building directly.
Book or Check Inspection Status
After passing all inspections, you may receive a Final Occupancy Certificate (for new dwellings).
This closes the permit and officially confirms the project meets all safety and code standards.
Submit complete and accurate drawings, incomplete applications cause major delays.
Check your zoning and conservation authority restrictions early.
Use the Express Permit service for small projects.
Keep digital files under size limits and follow PDF rules (no comments or layers).
Respond promptly to city examiners’ requests.
Hire a licensed architect, engineer, or design-build firm to handle submissions.
| Project Type | Average Review Time | Approximate Fee Range |
| Small interior renovation | 5–10 business days | $200–$600 |
| Home addition / second story | 3–6 weeks | $1,000–$3,000 |
| New custom home | 6–10 weeks | $3,000–$5,000+ |
| Laneway / garden suite | 4–8 weeks | $1,500–$3,000 |
View Current Building Permit Fees (Toronto)
Missing or incomplete documents
Zoning non-compliance
Tree protection or conservation issues
Drawings not sealed by a qualified designer/engineer
Outstanding property taxes or encumbrances
At Grand Design Build, we handle the entire permit process from zoning reviews and architectural drawings to city submissions and inspections.Our in-house engineers and project managers ensure your application is complete, compliant, and approved as quickly as possible.
Contact us today to discuss your project or request a free consultation.