Grand Design Build1558 Avenue Rd
Menu
Discuss your project

Major Renovations in Toronto

Kitchen and main floor renovations in Toronto

Plan the kitchen, dining and living areas together as part of a major main floor or whole house renovation. We take on kitchens as part of a larger main floor or whole home project, not cabinet or countertop refreshes on their own.

Bright white open kitchen and dining area framed by square columns

Cabinetry and millwork built in our own shop

We build our own cabinetry and millwork. Your kitchen cabinets, built-ins and trim are made in our shop to the same drawings our site team builds from, so layout, structure and finishes are planned together.

Open concept kitchens and main floors

Open kitchen and family room with tufted sofa and wide oak floors

Review how the kitchen connects to the dining and living rooms before choosing finishes. Plan circulation, storage, services and wall openings around the wider main floor layout.

Floor plan and interior design rendering

Design rendering

Removing a load-bearing wall in Toronto

Empty family room with coffered ceiling, fireplace and white built-in shelves

Review a proposed wall opening against the existing structure and layout before construction. Coordinate the engineering assessment, beam design and permit drawings within the agreed scope, including the effect on services and finishes.

Read our Toronto building permit guide.

Kitchen renovation cost in Toronto

A kitchen within a main floor renovation needs one scope for wall openings, cabinetry, appliances, services and finishes. Read the kitchen renovation cost guide before comparing inclusions, allowances and exclusions.

Kitchen and main floor renovation typical $90,000 to $250,000. Typical Toronto range, updated November 2026, before HST. Your price depends on scope, structure and finishes. Not a quote.

How a kitchen and main floor project runs

Powder room with black floating vanity, brass faucet, shell-tile feature wall

Every full house renovation follows the same six steps, from the first visit to handover.

Talk through your project
  1. 1

    Discuss how you want to live

    Start with what works, what does not and the changes that matter most to your household.

  2. 2

    Review the existing house

    Assess the layout, structure and relevant site conditions before developing the renovation approach.

  3. 3

    Develop the design and scope

    Coordinate the rooms, structural approach, services and finishes. Review inclusions, exclusions and responsibilities before construction.

  4. 4

    Prepare the approval work

    Coordinate the drawings and applications required within the agreed scope, including a Committee of Adjustment application where needed. Allow for review comments and further information. The proposal identifies how City fees, Committee fees and survey costs are handled.

  5. 5

    Manage the construction

    Sequence the work and trades around the project plan. Keep decisions and changes documented, with updates through the project coordinator.

  6. 6

    Review and hand over

    Walk through the finished work, record outstanding items and agree the follow-up. Confirm the applicable closeout and warranty documents.

GDB brochure presentation with a kitchen interior

GDB brochure presentation with a kitchen interior

Questions about your project

How much does a kitchen and main floor renovation cost?

A kitchen within a main floor renovation needs one scope for wall openings, cabinetry, appliances, services and finishes. Read the kitchen renovation cost guide before comparing inclusions, allowances and exclusions.

Kitchen and main floor renovation typical $90,000 to $250,000. Typical Toronto range, updated November 2026, before HST. Your price depends on scope, structure and finishes. Not a quote.

Do I need a permit to remove a load-bearing wall?

Structural wall changes need an assessed design and permit planning. The proposed work determines the drawings and approvals required. See our architectural design and permits service.

How long does a kitchen and main floor renovation take?

Typical time on site is 6 to 10 weeks once permits are in place. Your schedule depends on scope, structure and finishes.

Can we live at home during the work?

Clients stay with a temporary kitchen, or move out if the whole floor is opened.

Explore related services

Start here

Plan a home that works for you

Tell us what you want to change and what you want to keep. We can discuss the next step towards assessing your house and planning the renovation.

Contact us (416) 920-6066

  • Discuss your goals and the existing property.
  • Review the proposed scope and next steps.
  • Confirm the study scope and any fees before proceeding.

Tell us your project type and budget range.

Open our existing contact page