Additions in Toronto
Second storey additions and loft conversions in Toronto
Plan more living space above the existing home, with the structure, layout, stairs and approvals considered together. The house and lot guide the next steps.

Second storey and second floor additions

Plan a new second floor or review a loft conversion within the existing attic or top floor. The two scopes have different structural work, prices and timelines.
Adding a second storey to a bungalow

A new floor can provide space above the existing footprint. Review the bungalow and proposed room layout before deciding what the addition should include.
Structure and foundations

Review how the existing foundations and structure relate to the proposed addition. Coordinate the structural approach with the design and identify the work required before agreeing the construction scope.
Read about demolishing for renovation and additions.
Stairs and layout

Plan the stair connection alongside the rooms on both floors. Consider circulation, daylight and the relationship between the existing home and the new space.
Permits and Committee of Adjustment
Review zoning and whether the proposal fits the rules as written. Coordinate architectural and structural drawings, the application and follow up on review comments. Where a minor variance is needed, plan the Committee of Adjustment application within the agreed scope.
Read our Toronto building permit guide.
Second storey addition cost in Toronto
The existing structure, stairs, services, roof and finishes affect the scope. Read the second storey addition cost guide before comparing project estimates.
Second storey addition from $375 to $600+ per sq ft, typical $300,000 to $600,000 for 800 to 1,000 sq ft. Typical Toronto range, updated November 2026, before HST. Your price depends on scope, structure and finishes. Not a quote.
Living elsewhere during the work
Typical time on site is 3 to 5 months from the start of work after permits. Your schedule depends on scope, structure and finishes. Clients usually move out during the work.
Loft, attic and third floor conversions

We convert the attic or top floor into a third floor. This work may include dormers or a raised roof. It does not mean building a complete new storey. We handle the full project: feasibility, design, permits and construction.
Typical $150,000 to $200,000 for about 850 to 1,000 sq ft. Typical Toronto range, updated November 2026, before HST. Your price depends on scope, structure and finishes. Not a quote.
2 to 3 months from the start of work after permits. Clients usually move out during the work.
How your project runs
Every home addition follows the same six steps, from the first visit to handover.
Talk through your project- 1
Discuss your goals
Tell us what no longer works in your home and what you want the addition to change. Start with a call or a visit to our design centre.
- 2
Review the house and lot
Review the existing structure, setbacks, height, lot coverage, floor space index and angular plane. These affect how much can be built and where. Establish whether the design fits the zoning rules as written or needs a minor variance application.
- 3
Develop the design and scope
Work through the layout, structural approach and key finishes. Review the proposed scope, exclusions and responsibilities.
- 4
Coordinate permits and approvals
Coordinate the City of Toronto permit drawings and application work within the agreed scope. If a minor variance is needed, plan the Committee of Adjustment application and allow for review comments, decisions and any further requirements.
- 5
Build and keep you informed
Coordinate trades and the construction sequence. Keep changes and decisions documented, with updates through the project coordinator.
- 6
Walk through the finished addition
Review the completed work, record any outstanding items and agree how they will be addressed. Confirm the applicable closeout and warranty documents.
Gallery
Questions about your project
Can a bungalow support a second storey?
The existing foundations and structure need review alongside the proposed design. Feasibility is assessed for the particular house.
What does a second storey addition cost?
Review the work included in our second storey addition cost guide. Second storey addition from $375 to $600+ per sq ft, typical $300,000 to $600,000 for 800 to 1,000 sq ft. Typical Toronto range, updated November 2026, before HST. Your price depends on scope, structure and finishes. Not a quote.
Will the project need Committee of Adjustment approval?
The approval route depends on the proposal and property. Review zoning first and establish whether a minor variance application is needed.
How long does a second storey addition take?
Typical time on site is 3 to 5 months from the start of work after permits. Your schedule depends on scope, structure and finishes. Clients usually move out during the work.
What does a loft or attic conversion cost?
Typical $150,000 to $200,000 for about 850 to 1,000 sq ft. Typical Toronto range, updated November 2026, before HST. Your price depends on scope, structure and finishes. Not a quote.
How long does a loft or attic conversion take?
2 to 3 months from the start of work after permits. Clients usually move out during the work.
Does a third floor conversion mean a complete new storey?
We convert the attic or top floor into a third floor. This work may include dormers or a raised roof. It does not mean building a complete new storey. We handle the full project: feasibility, design, permits and construction.
Explore related services
Start here
Start with what your home needs
Tell us where you need more room and how you want to use it. We can discuss the next step towards reviewing your property and planning the addition.
Contact us (416) 920-6066
- Discuss your goals and the existing property.
- Review the proposed scope and next steps.
- Confirm the study scope and any fees before proceeding.
Tell us your project type and budget range.









